The farm will have a power of 50 MW and will comprise 10 floating platforms, each of which will have a 5 MW wind turbine.
The project, which will feature Basque technology and design, would be able to market energy produced as of 2016, although it is not expected to function at full capacity until 2020.
Sources: Noticias de Gipuzkoa and windpoweroffshore.com